CURRENT DEFLECTING WALL DEURGANCKDOK – ANTWERPEN

This curved wall with a threshold at the bottom is intended to reduce sedimentation in the Deurganckdok.

For the construction of the Current Deflecting Wall in the Scheldt, steel tubular piles are first vibrated into the ground. Subsequently, the steel sheets are installed between the Ø2.400mm tubular piles.

SUPPLIED BY MEEVER PIPES:

  • ?? ton steel pipes